Geodesic equals energy critical path

From Diffgeom
Revision as of 10:26, 5 August 2007 by Vipul (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Statement

Let M be a complete Riemannian manifold. Then the piecewise smooth geodesics in M are precisely the same as the critical paths of the energy functional.