Geodesic equals energy critical path

From Diffgeom
Revision as of 10:49, 5 August 2007 by Vipul (talk | contribs)

Statement

Let be a complete Riemannian manifold. Then the piecewise smooth geodesics in are precisely the same as the critical paths of the energy functional.

Proof

Geodesic implies critical path of energy functional

This is clear -- any geodesic is locally length-minimizing, and hence, locally energy-minimizing, and hence, it must be a critical path of the energy functional.

Critical path of energy functional implies geodesic

The proof of this follows by cleverly choosing a variation, and then applying the first variation formula to conclude, from the vanishing of the derivative, that the acceleration vector must vanish at each point.