Geodesic equals energy critical path

From Diffgeom
Revision as of 19:41, 18 May 2008 by Vipul (talk | contribs) (2 revisions)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Statement

Let M be a complete Riemannian manifold. Then the piecewise smooth geodesics in M are precisely the same as the critical paths of the energy functional.

Proof

Geodesic implies critical path of energy functional

This is clear -- any geodesic is locally length-minimizing, and hence, locally energy-minimizing, and hence, it must be a critical path of the energy functional.

Critical path of energy functional implies geodesic

The proof of this follows by cleverly choosing a variation, and then applying the first variation formula to conclude, from the vanishing of the derivative, that the acceleration vector must vanish at each point.